{"id":12004,"date":"2020-04-29T23:16:10","date_gmt":"2020-04-29T23:16:10","guid":{"rendered":"https:\/\/www.basham.com.mx\/?p=12004"},"modified":"2020-04-29T23:16:10","modified_gmt":"2020-04-29T23:16:10","slug":"construction-of-the-mayan-railroad-calkini-campeche-izamal-yucatan-section","status":"publish","type":"post","link":"https:\/\/basham.com.mx\/en\/construction-of-the-mayan-railroad-calkini-campeche-izamal-yucatan-section\/","title":{"rendered":"CONSTRUCTION OF THE MAYAN RAILROAD CALKIN\u00cd (CAMPECHE) \u2013 IZAMAL (YUCAT\u00c1N) SECTION"},"content":{"rendered":"<p style=\"text-align: right;\">Mexico,City, April 29th, 2020.<\/p>\n<p>On April 28, 2020, the Mexican National Fund to Promote Tourism (FONATUR, for its acronym in Spanish) announced the receipt of 16 economic proposals for the construction of the third section of the Mayan Railroad project to be developed throughout the Yucat\u00e1n Peninsula.<\/p>\n<p>The third section of the project will comprise a route of approximately 172 Km running from Calkin\u00ed (Campeche) &#8211; up to Izamal (Yucat\u00e1n).<\/p>\n<p>Proposals filed on April 28, 2020 will be analyzed by FONATUR under a points and percentage criteria. Technical and economic proposals will have, each, a value of 50 points.<\/p>\n<p>Proposals filed to FONATUR were as follows:<\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"19\"><strong>No.<\/strong><\/td>\n<td width=\"359\"><strong>Participant<\/strong><\/td>\n<td width=\"189\"><strong>Amount without VAT<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"19\">1.<\/td>\n<td width=\"359\">CAABSA Constructora, S.A. de C.V.<\/p>\n<p>COMSA Infraestructura, S.A. de C.V.<\/p>\n<p>Grupo Constructor Diamante, S.A. de C.V.<\/p>\n<p>CAABSA Infraestructura, S.A. de C.V.<\/p>\n<p>Prefabricados y Transportes PRET, S.A. de C.V.<\/td>\n<td width=\"189\">$9,765,556,932.29<\/td>\n<\/tr>\n<tr>\n<td width=\"19\">2.<\/td>\n<td width=\"359\">Construcciones Urales, S.A. de C.V.<\/p>\n<p>Gami Ingenier\u00eda e Instalaciones, S.A. de C.V.<\/p>\n<p>AZVI S.A.U.<\/td>\n<td width=\"189\">$10,192,938,694.58<\/td>\n<\/tr>\n<tr>\n<td width=\"19\">3.<\/td>\n<td width=\"359\">Arturo Hern\u00e1ndez Gonz\u00e1lez<\/p>\n<p>Sanybrac Construcciones, S.A. de C.V.<\/p>\n<p>Constructora y Servicios Aress, S.A. de C.V.<\/p>\n<p>Enrique P\u00e9rez Jim\u00e9nez<\/p>\n<p>Andermex, S.A. de C.V.<\/p>\n<p>Jairo Enrique P\u00e9rez Nandez<\/p>\n<p>Geotecnica Supervisi\u00f3n, Ingenier\u00eda y Contri de Calidad, S.A. de C.V.<\/p>\n<p>Corporativo Multidisciplinario BGG, S.A. de C.V.<\/p>\n<p>KIN Construyendo Ideas, S.A. de C.V.<\/p>\n<p>GCH Construcciones, S.A. de C.V.<\/p>\n<p>Xime Energy, S. de R.L. de C.V.<\/p>\n<p>ElectroConstrucciones MD, S.A. de C.V.<\/p>\n<p>Galoma, S.A. de C.V.<\/p>\n<p>Desarrollo Mantenimiento y Servicios San Juan, S.A. de C.V.<\/td>\n<td width=\"189\">$10,275,848,637.22<\/td>\n<\/tr>\n<tr>\n<td width=\"19\">4.<\/td>\n<td width=\"359\">Sinohydro M\u00e9xico, S.A. de C.V.<\/p>\n<p>Power China International Group Company<\/p>\n<p>Constructora e Inmobiliatia Atica, S.A. de C.V.<\/p>\n<p>Sack Construcciones y Maquinar\u00eda, S.A. de C.V.<\/p>\n<p>ALSO Construcci\u00f3n y Supervisi\u00f3n, S.A. de C.V.<\/p>\n<p>Fuerza de Apoyo Constructiva de Occidente, S.A. de C.V.<\/td>\n<td width=\"189\">$10,322,893,853.84<\/td>\n<\/tr>\n<tr>\n<td width=\"19\">5.<\/td>\n<td width=\"359\">Grupo Industrial Rubio, S.A. de C.V.<\/p>\n<p>China Railway International Group Co. Ltd.<\/td>\n<td width=\"189\">$10,339,601,106.93<\/td>\n<\/tr>\n<tr>\n<td width=\"19\">6.<\/td>\n<td width=\"359\">Sacyr Construcci\u00f3n M\u00e9xico, S.A. de C.V.<\/p>\n<p>Sacyr Construcci\u00f3n S.A.U.<\/p>\n<p>Sacyr Neopul, S.A.<\/p>\n<p>T\u00e9cnicos Especialistas de Chiapas, S.A. de C.V.<\/p>\n<p>Constructora Gordillo, S.A. de C.V.<\/p>\n<p>Impulsora de Soluciones en Infraestructura, S.A. de C.V.<\/p>\n<p>Escudero Construcciones, S.A. de C.V.<\/td>\n<td width=\"189\">$10,460,395,445.35<\/td>\n<\/tr>\n<tr>\n<td width=\"19\">7.<\/td>\n<td width=\"359\">ICA Constructor, S.A. de C.V.<\/p>\n<p>ICA Infraestructura, S.A. de C.V.<\/p>\n<p>Impulsora de Desarrollo Integral, S.A. de C.V.<\/td>\n<td width=\"189\">$10,486,096,207.12<\/td>\n<\/tr>\n<tr>\n<td width=\"19\">8.<\/td>\n<td width=\"359\">Citcocomex Group, S. de R.L. de C.V.<\/p>\n<p>Constructora Andrade Guti\u00e9rrez, S.A. de C.V.<\/p>\n<p>Ocean Marine, S.A. de C.V.<\/p>\n<p>Rieles Proyecto y Obra, S.A. de C.V.<\/p>\n<p>Marinsa Ce M\u00e9xico, S.A. de C.V.<\/p>\n<p>FMI proyects S. de R.L. de C.V.<\/p>\n<p>Armadora Tabasque\u00f1a, S.A. de C.V.<\/p>\n<p>Maren Marine Energy S.A.P.I de C.V.<\/td>\n<td width=\"189\">$10,828,878,811.02<\/td>\n<\/tr>\n<tr>\n<td width=\"19\">9.<\/td>\n<td width=\"359\">Constructora y Edificadora GIA+A, S.A. de C.V.<\/p>\n<p>China Railway Construction Corporation Limited<\/p>\n<p>China Railway Construction M\u00e9xico, S.A. de C.V.<\/td>\n<td width=\"189\">$10,882,448,939.86<\/td>\n<\/tr>\n<tr>\n<td width=\"19\">10.<\/td>\n<td width=\"359\">S.A. de Obras y Servicios COPASA<\/p>\n<p>Caltia Concesiones, S.A. de C.V.<\/p>\n<p>Regiomontana de Construcci\u00f3n de Servicios S.A.P.I de C.V.<\/p>\n<p>Promotora y Desarrolladora Mexicana, S.A. de C.V.<\/p>\n<p>Prodemex Construcciones, S.A. de C.V.<\/td>\n<td width=\"189\">$12,159,941,386.73<\/td>\n<\/tr>\n<tr>\n<td width=\"19\">11.<\/td>\n<td width=\"359\">Grupo Constructor ZEA, S.A. de C.V.<\/p>\n<p>Chinga Gezhouba Grouo Company Limited<\/p>\n<p>Constructora e Impulsora Condor, S.A. de C.V.<\/p>\n<p>Maya Mining &amp; Infrastructure, S.A. de C.V.<\/p>\n<p>Grupo Viasa, S.A. de C.V.<\/p>\n<p>IMEVAL de Occidente, S.A. de C.V.<\/p>\n<p>Grupo de Ingenier\u00eda y Comercial CERSA, S.A. de C.V.<\/p>\n<p>Grupo de Desarrollo de Morelos, S.A. de C.V.<\/p>\n<p>Quality Reails, S.A. de C.V.<\/p>\n<p>Construcci\u00f3n y Electrificaci\u00f3n Log\u00edstica, S.A. de C.V.<\/p>\n<p>FOJA Ingenieros Constructores, S.A. de C.V.<\/td>\n<td width=\"189\">$12,677,407,663.46<\/td>\n<\/tr>\n<tr>\n<td width=\"19\">12.<\/td>\n<td width=\"359\">\u00a0FCC Construcci\u00f3n, S.A. de C.V.<\/p>\n<p>Operadora Cicsa, S.A. de C.V.<\/td>\n<td width=\"189\">$12,746,939,560.47<\/td>\n<\/tr>\n<tr>\n<td width=\"19\">13.<\/td>\n<td width=\"359\">Grupo ARHE Corporativo de Servicios en Construcci\u00f3n, S. de R.L. de C.V.<\/p>\n<p>MAC Tabasco, S.A. de C.V.<\/p>\n<p>Maxi Constructora Hidr\u00e1ulica y Mantenimiento Integral, S.A de C.V.<\/p>\n<p>Virgo Caminos y Construcciones, S.A. de C.V.<\/p>\n<p>PACCSA Ingenier\u00eda, S.A. de C.V.<\/p>\n<p>Construcciones y Desarrollos ACRE, S.A. de C.V.<\/td>\n<td width=\"189\">$12,754,532,052.40<\/td>\n<\/tr>\n<tr>\n<td width=\"19\">14.<\/td>\n<td width=\"359\">Grupo V\u00e1zquez del Sur, S.A. de C.V.<\/p>\n<p>Grupo CICPSA, S.A. de C.V.<\/p>\n<p>CIACSA, S.A. de C.V.<\/p>\n<p>Engineering and Real Estate Development of Mexico, S.A. de C.V.<\/p>\n<p>Constructora Tierra y Asfalto, S.A. de C.V.<\/p>\n<p>Desasolves, Bordos y Dragados del Sureste, S.A. de C.V.<\/p>\n<p>Interdisciplinary Group for the Integral Development of Engineering, S.A. de C.V.<\/p>\n<p>Constructora Ma\u00edz Mier, S.A. de C.V.<\/p>\n<p>Rubau M\u00e9xico, S. de R.L. de C.V.<\/p>\n<p>Construcciones Rubau, S.A.<\/td>\n<td width=\"189\">$13,046,019,478.93<\/td>\n<\/tr>\n<tr>\n<td width=\"19\">15.<\/td>\n<td width=\"359\">Omega Construcciones Industriales, S.A. de C.V.<\/p>\n<p>Omega Corp, S.A. de C.V.<\/p>\n<p>Asch, S.A. de C.V.<\/p>\n<p>Coopsa Ambiental, S.A. de C.V.<\/p>\n<p>Quantivia Engineering and Construction S.A.P.I. de C.V.<\/td>\n<td width=\"189\">$13,798,292,719.22<\/td>\n<\/tr>\n<tr>\n<td width=\"19\">16.<\/td>\n<td width=\"359\">Acciona Infraestructura M\u00e9xico, S.A. de C.V.<\/p>\n<p>M\u00e9xico Proyectos y Desarrollo, S.A. de C.V.<\/td>\n<td width=\"189\">$17,236,159,876.48<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p>Ruling for the construction of this third section is expected to take place on May 15<sup>th<\/sup>, 2020 for works to begin on May 25<sup>th<\/sup>, 2020.<\/p>\n<p>&nbsp;<\/p>\n<p>With this project Mexican President seeks to promote and strengthen the development of the southeast Mexican region since such project would include the Mexican States of Tabasco, Chiapas, Campeche, Yucat\u00e1n and Quintana Roo.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\">The lawyers of the energy and infrastructure area as well as the transportation one at firm are available for any questions or comments on the above.<\/p>\n<p style=\"text-align: center;\">SINCERELY,<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><strong>Juan Carlos Serra<\/strong><\/p>\n<p style=\"text-align: center;\"><a href=\"mailto:serra@basham.com.mx\">serra@basham.com.mx<\/a><\/p>\n<p style=\"text-align: center;\">\n<p style=\"text-align: center;\"><strong>Jorge <\/strong><strong>Eduardo Escobedo Monta\u00f1o<\/strong><\/p>\n<p style=\"text-align: center;\"><a href=\"mailto:jescobedo@basham.com.mx\">jescobedo@basham.com.mx<\/a><\/p>\n<p style=\"text-align: center;\">\n<p style=\"text-align: center;\"><strong>Miguel Figueroa Morgado<\/strong><\/p>\n<p style=\"text-align: center;\"><a href=\"mailto:mfigueroa@basham.com.mx\">mfigueroa@basham.com.mx<\/a><\/p>\n<p style=\"text-align: center;\">\n<p style=\"text-align: center;\"><strong>Pedro Reynoso Ram\u00edn<\/strong><\/p>\n<p style=\"text-align: center;\"><a href=\"mailto:preynoso@basham.com.mx\">preynoso@basham.com.mx<\/a><\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>Mexico,City, April 29th, 2020. On April 28, 2020, the Mexican National Fund to Promote Tourism (FONATUR, for its acronym in Spanish) announced the receipt of 16 economic proposals for the construction of the third section of the Mayan Railroad project to be developed throughout the Yucat\u00e1n Peninsula. The third section of the project will comprise [&hellip;]<\/p>","protected":false},"author":15,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_crdt_document":"","footnotes":""},"categories":[1337,1324,1348],"tags":[],"class_list":["post-12004","post","type-post","status-publish","format-standard","hentry","category-energy-en","category-english-en","category-infrastructure-en"],"_links":{"self":[{"href":"https:\/\/basham.com.mx\/en\/wp-json\/wp\/v2\/posts\/12004","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/basham.com.mx\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/basham.com.mx\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/basham.com.mx\/en\/wp-json\/wp\/v2\/users\/15"}],"replies":[{"embeddable":true,"href":"https:\/\/basham.com.mx\/en\/wp-json\/wp\/v2\/comments?post=12004"}],"version-history":[{"count":0,"href":"https:\/\/basham.com.mx\/en\/wp-json\/wp\/v2\/posts\/12004\/revisions"}],"wp:attachment":[{"href":"https:\/\/basham.com.mx\/en\/wp-json\/wp\/v2\/media?parent=12004"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/basham.com.mx\/en\/wp-json\/wp\/v2\/categories?post=12004"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/basham.com.mx\/en\/wp-json\/wp\/v2\/tags?post=12004"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}