{"id":19592,"date":"2018-03-21T14:26:05","date_gmt":"2018-03-21T20:26:05","guid":{"rendered":"http:\/\/www.basham.com.mx\/Blog\/?p=1230"},"modified":"2018-03-21T14:26:05","modified_gmt":"2018-03-21T20:26:05","slug":"round-3-3-cnh-r03-l032018","status":"publish","type":"post","link":"https:\/\/basham.com.mx\/en\/round-3-3-cnh-r03-l032018\/","title":{"rendered":"Round 3.3 CNH-R03-L03\/2018"},"content":{"rendered":"<p><strong>Round 3.3<\/strong><\/p>\n<p><strong>CNH-R03-L03\/2018<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p>In reference to the tenders called by the National Hydrocarbons Commission (\u201cCNH\u201d) regarding the awarding of Exploration and Extraction of Hydrocarbons Contracts (\u201cE&amp;E Contracts). On March 2018, CNH announced the Third Tender of Round Three (CNH-R03-L03\/2018), which compels 9 conventional and non-conventional contractual onshore areas located within the region known as Burgos.<\/p>\n<p>Resources include: <strong>(i)<\/strong> wet gas and <strong>(ii)<\/strong> dry gas.<\/p>\n<p>Contractual areas for Round 3.3 include 53 million barrels of conventional prospective resources and 1.6 billion of non-conventional prospective resources within a surface of 1,704 square meters.<\/p>\n<p>As per the information released by the Energy Ministry (\u201cSENER\u201d) the region in which the contractual area is located already has industrial infrastructure, such as: <strong>(i)<\/strong> the Cadereyta oil Refinery; <strong>(ii)<\/strong> 45 industrial parks in Tamaulipas and 126 in Nuevo Leon; <strong>(iii)<\/strong> 6 powers plants; <strong>(iv)<\/strong> 18 exploratory wells; <strong>(v)<\/strong> Matamoros and Tampico ports; <strong>(vi)<\/strong> gas pipelines known as Tamaulipas and Los Ramones.<\/p>\n<p><strong>Calendar:<\/strong><\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"283\">Invitation announcement and Bidding Guidelines<\/td>\n<td width=\"283\">March 02, 2018<\/td>\n<\/tr>\n<tr>\n<td width=\"283\">Updated Bidding Guidelines<\/td>\n<td width=\"283\">August 03, 2018<\/td>\n<\/tr>\n<tr>\n<td width=\"283\">Request and payment to Access virtual data room<\/td>\n<td width=\"283\">March 05, 2018 to June 12, 2018<\/td>\n<\/tr>\n<tr>\n<td width=\"283\">Access to virtual data room<\/td>\n<td width=\"283\">March 05, 2018 to June 12, 2018<\/td>\n<\/tr>\n<tr>\n<td width=\"283\">Visits to contractual areas<\/td>\n<td width=\"283\">June 19, 2018 to August 31, 2018<\/td>\n<\/tr>\n<tr>\n<td width=\"283\">First clarification stage<\/td>\n<td width=\"283\">March 02, 2018 to June 04, 2018<\/td>\n<\/tr>\n<tr>\n<td width=\"283\">Second clarification stage<\/td>\n<td width=\"283\">March 02, 2018 to June 07, 2018<\/td>\n<\/tr>\n<tr>\n<td width=\"283\">Third clarification stage<\/td>\n<td width=\"283\">March 02, 2018 to July 07, 2018<\/td>\n<\/tr>\n<tr>\n<td width=\"283\">Bid registration and payment and prequalification requirement submission<\/td>\n<td width=\"283\">March 02, 2018 to June 14, 2018<\/td>\n<\/tr>\n<tr>\n<td width=\"283\">Prequalification documents reception<\/td>\n<td width=\"283\">June 19, 2018 to June 22, 2018<\/td>\n<\/tr>\n<tr>\n<td width=\"283\">Review of prequalification documents<\/td>\n<td width=\"283\">June 25, 2018 to August 01, 2018<\/td>\n<\/tr>\n<tr>\n<td width=\"283\">Release of prequalified companies<\/td>\n<td width=\"283\">August 03, 2018<\/td>\n<\/tr>\n<tr>\n<td width=\"283\">Authorization requirements to conform bidders<\/td>\n<td width=\"283\">August 08, 2018 to August 09, 2018<\/td>\n<\/tr>\n<tr>\n<td width=\"283\">Filing of proposals<\/td>\n<td width=\"283\">September 05, 2018<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p><strong>Prequalification Specifications:<\/strong><\/p>\n<p><strong>For Operators:<\/strong><\/p>\n<ul>\n<li>Experience as operator in at least one exploration and\/or extraction project in onshore areas during the past five years, or<\/li>\n<li>Experience of the proposed team in management areas of at least 10 years in exploration \/ extraction projects in onshore areas.<\/li>\n<li>Investments in exploration \/ extraction projects of at least 100 million USD.<\/li>\n<li>Capital of at least 100 million USD.<\/li>\n<\/ul>\n<p><strong>For Non-Operators.<\/strong><\/p>\n<ul>\n<li>Capital of at least 50 million USD.<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p>For Round 3.1 the model contract to be use will be License Contract.<\/p>\n<p>The lawyers of the energy, mining and infrastructure area of our firm are available for any questions or comments on the above.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\">SINCERELY<\/p>\n<p>&nbsp;<\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"294\">Juan Carlos Serra<\/td>\n<td width=\"294\">serra@basham.com.mx<\/td>\n<\/tr>\n<tr>\n<td width=\"294\">Jorge Eduardo Escobedo Monta\u00f1o<\/td>\n<td width=\"294\">jescobedo@basham.com.mx<\/td>\n<\/tr>\n<tr>\n<td width=\"294\">Jorge Cobos<\/td>\n<td width=\"294\">jcobos@basham.com.mx<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\">Mexico City, March 21st, 2018<\/p>","protected":false},"excerpt":{"rendered":"<p>Round 3.3 CNH-R03-L03\/2018 \u00a0 In reference to the tenders called by the National Hydrocarbons Commission (\u201cCNH\u201d) regarding the awarding of Exploration and Extraction of Hydrocarbons Contracts (\u201cE&amp;E Contracts). On March 2018, CNH announced the Third Tender of Round Three (CNH-R03-L03\/2018), which compels 9 conventional and non-conventional contractual onshore areas located within the region known as [&hellip;]<\/p>","protected":false},"author":15,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_crdt_document":"","footnotes":""},"categories":[1266,1264],"tags":[],"class_list":["post-19592","post","type-post","status-publish","format-standard","hentry","category-energy","category-english"],"_links":{"self":[{"href":"https:\/\/basham.com.mx\/en\/wp-json\/wp\/v2\/posts\/19592","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/basham.com.mx\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/basham.com.mx\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/basham.com.mx\/en\/wp-json\/wp\/v2\/users\/15"}],"replies":[{"embeddable":true,"href":"https:\/\/basham.com.mx\/en\/wp-json\/wp\/v2\/comments?post=19592"}],"version-history":[{"count":0,"href":"https:\/\/basham.com.mx\/en\/wp-json\/wp\/v2\/posts\/19592\/revisions"}],"wp:attachment":[{"href":"https:\/\/basham.com.mx\/en\/wp-json\/wp\/v2\/media?parent=19592"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/basham.com.mx\/en\/wp-json\/wp\/v2\/categories?post=19592"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/basham.com.mx\/en\/wp-json\/wp\/v2\/tags?post=19592"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}