{"id":968,"date":"2017-10-02T19:05:46","date_gmt":"2017-10-03T00:05:46","guid":{"rendered":"http:\/\/www.basham.com.mx\/Blog\/?p=968"},"modified":"2017-10-02T19:05:46","modified_gmt":"2017-10-03T00:05:46","slug":"round-3-1-cnh-r03-l012017","status":"publish","type":"post","link":"https:\/\/basham.com.mx\/en\/round-3-1-cnh-r03-l012017\/","title":{"rendered":"Round 3.1 CNH-R03-L01\/2017"},"content":{"rendered":"<p>In reference to the tenders called by the National Hydrocarbons Commission (\"CNH\") regarding the awarding of Exploration and Extraction of Hydrocarbons Contracts (\"E&amp;E Contracts). On September 28, 2017, CNH announced the First Tender of Round Three (CNH-R03-L01\/2017), which compels 35 Contractual areas located within the regions known as: <strong>(i)<\/strong> Burgos, <strong>(ii)<\/strong> Tampico-Misantla-Veracruz, and <strong>(iii)<\/strong> Southeastern Basins.<\/p>\n<p>Resources include: <strong>(i)<\/strong> oil, <strong>(ii)<\/strong> gas, and <strong>(iii)<\/strong> wet gas.<\/p>\n<p>Contractual areas are located in the regions known as: (i) Burgos, (ii) Tampico-Misantla-Veracruz, and (iii) Cuencas del Sureste.<\/p>\n<p>1.1., 1.2., 1.4., 2.1., and 2.4. plus, PEMEX allocations and PEMEX Far, Outs.<\/p>\n<p>Contractual areas for Round 3.1 will have better 2D and 3D coverage.<\/p>\n<p>Prospective resources of Round 3.1 are equal to 70% of the resources in shallow waters included in the Five-Year Term Bid Plan.<\/p>\n<p><strong>Location: <\/strong><\/p>\n<p><a href=\"http:\/\/www.basham.com.mx\/Blog\/wp-content\/uploads\/2017\/10\/ada.jpg\"><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone size-full wp-image-969\" src=\"http:\/\/www.basham.com.mx\/Blog\/wp-content\/uploads\/2017\/10\/ada.jpg\" alt=\"\" width=\"486\" height=\"404\" \/><\/a><\/p>\n<p><strong>Calendar:<\/strong><\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"283\">Invitation announcement and Bidding Guidelines<\/td>\n<td width=\"283\">September 29, 2017<\/td>\n<\/tr>\n<tr>\n<td width=\"283\">Updated Bidding Guidelines<\/td>\n<td width=\"283\">February 26, 2018<\/td>\n<\/tr>\n<tr>\n<td width=\"283\">Request and payment to Access virtual data room<\/td>\n<td width=\"283\">October 16, 2017 to January 16, 2018<\/td>\n<\/tr>\n<tr>\n<td width=\"283\">Access to virtual data room<\/td>\n<td width=\"283\">October 16, 2017 to March 26, 2018<\/td>\n<\/tr>\n<tr>\n<td width=\"283\">First clarification stage<\/td>\n<td width=\"283\">September 29, 2017 to January 11, 2018<\/td>\n<\/tr>\n<tr>\n<td width=\"283\">Second clarification stage<\/td>\n<td width=\"283\">September 29, 2017 to January 11, 2018<\/td>\n<\/tr>\n<tr>\n<td width=\"283\">Third clarification stage<\/td>\n<td width=\"283\">September 29, 2017 to February 20, 2018<\/td>\n<\/tr>\n<tr>\n<td width=\"283\">Bid registration and payment and prequalification requirement submission<\/td>\n<td width=\"283\">September 29, 2017 to January 19, 2018<\/td>\n<\/tr>\n<tr>\n<td width=\"283\">Prequalification documents reception<\/td>\n<td width=\"283\">January 22, 2018 to January 24, 2018<\/td>\n<\/tr>\n<tr>\n<td width=\"283\">Review of prequalification documents<\/td>\n<td width=\"283\">January 25, 2018 to February 23, 2018<\/td>\n<\/tr>\n<tr>\n<td width=\"283\">Release of prequalified companies<\/td>\n<td width=\"283\">February 26, 2018<\/td>\n<\/tr>\n<tr>\n<td width=\"283\">Authorization requirements to conform bidders<\/td>\n<td width=\"283\">March 06, 2018 to March 08, 2018<\/td>\n<\/tr>\n<tr>\n<td width=\"283\">Filing of proposals<\/td>\n<td width=\"283\">March 27, 2018<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p><strong>Prequalification Specifications:<\/strong><\/p>\n<p><strong>For Operators:<\/strong><\/p>\n<ul>\n<li>Experience as operator in at least one exploration and\/or extraction project in shallow waters during the past five years, or<\/li>\n<li>Capital investments in exploration and\/or extraction projects in shallow waters of at least one billion USD.<\/li>\n<li>To prove experience in matters related to operational management systems, industrial and operative safety and environmental protection in installations or exploration and\/or extraction of hydrocarbons projects in shallow and\/or deep waters during the last five years.<\/li>\n<li>Capital of at least one billion USD, or<\/li>\n<li>Assets with a value of at least 10 billion USD.<\/li>\n<\/ul>\n<p><strong>For Non-Operators.<\/strong><\/p>\n<ul>\n<li>Capital of at least 250 million USD.<\/li>\n<\/ul>\n<p>For Round 3.1 the model contract to be use will be Production Sharing Contract.<\/p>\n<p>The lawyers of the energy, mining and infrastructure area of our firm are available for any questions or comments on the above.<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><strong>Juan Carlos Serra<\/strong><\/p>\n<p style=\"text-align: center;\"><u>serra@basham.com.mx<\/u><\/p>\n<p style=\"text-align: center;\"><strong>Jorge <\/strong><strong>Eduardo Escobedo Monta\u00f1o<\/strong><\/p>\n<p style=\"text-align: center;\"><a href=\"mailto:jescobedo@basham.com.mx\">jescobedo@basham.com.mx<\/a><\/p>\n<p style=\"text-align: center;\"><strong>Jorge Garay Lebrija<\/strong><\/p>\n<p style=\"text-align: center;\"><a href=\"mailto:jgaray@basham.com.mx\">jgaray@basham.com.mx<\/a><\/p>\n<p style=\"text-align: center;\">\n<p style=\"text-align: center;\">Mexico City, October 2<sup>nd<\/sup>, 2017<\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>In reference to the tenders called by the National Hydrocarbons Commission (\u201cCNH\u201d) regarding the awarding of Exploration and Extraction of Hydrocarbons Contracts (\u201cE&amp;E Contracts). On September 28, 2017, CNH announced the First Tender of Round Three (CNH-R03-L01\/2017), which compels 35 Contractual areas located within the regions known as: (i) Burgos, (ii) Tampico-Misantla-Veracruz, and (iii) Cuencas [&hellip;]<\/p>","protected":false},"author":15,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_crdt_document":"","footnotes":""},"categories":[1266,1264,1307],"tags":[],"class_list":["post-968","post","type-post","status-publish","format-standard","hentry","category-energy","category-english","category-mining"],"_links":{"self":[{"href":"https:\/\/basham.com.mx\/en\/wp-json\/wp\/v2\/posts\/968","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/basham.com.mx\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/basham.com.mx\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/basham.com.mx\/en\/wp-json\/wp\/v2\/users\/15"}],"replies":[{"embeddable":true,"href":"https:\/\/basham.com.mx\/en\/wp-json\/wp\/v2\/comments?post=968"}],"version-history":[{"count":0,"href":"https:\/\/basham.com.mx\/en\/wp-json\/wp\/v2\/posts\/968\/revisions"}],"wp:attachment":[{"href":"https:\/\/basham.com.mx\/en\/wp-json\/wp\/v2\/media?parent=968"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/basham.com.mx\/en\/wp-json\/wp\/v2\/categories?post=968"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/basham.com.mx\/en\/wp-json\/wp\/v2\/tags?post=968"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}